Loka Ecosystem
Mining Sites & Operation
2min
The first batch of mining farm is plugged in directly to a hydro power plant absorbing the excess energy of ~5 Megawatt in Aceh, Sumatra island, Indonesia, at cost maximum of $0.04 operates by our sister company.
This power plant has a max capacity of 10MW, but the electricity demand is only maxed at 5MW.

- Reliability and Stability Loka aims for a long-term and reliable operation, and the size of our partners’ mining farm has reached economies of scale everything is optimized.
- Guaranteed 99.9% uptime Our energy partner supplied us with an uninterrupted power supply at least 99,9% of the time -We use three independent fibre optic uplinks alongside a fourth wireless backup for network redundancy.
- In-house repair centre Our mining operator has in-house repair centers with stocked spare parts to fix whatever we can immediately on-site, without needing to send the equipment to the manufacturer’s repair facility physically.
- Dedicated power meters connected to each device Dedicated power meters are installed directly on the device, so each mining contract is not billed for the energy consumed by the fan or other airflow equipment.
- On-site and remote monitoring We set up integrated 24/7 equipment monitoring, optimizing and handling system for the device, so we are always in full control, including all real-time settings of every device.